NTPC starts commercial operation of second part capacity at Kayamkulam Floating Solar PV Project
20th May 2022

NTPC has started commercial operation of second part capacity of 35 MW out of 92 MW Kayamkulam Floating Solar PV Project at Kayamkulam, Kerala. The first part capacity of 22 MW has already been declared on commercial operation.

With this, standalone installed and commercial capacity of NTPC has become 54651.68 MW. Further, group installed and commercial capacity of NTPC has become 69016.68 and 68356.68 MW respectively.

NTPC is the largest power utility company in India and has presence in Coal, Gas, Solar PV, Hydro and Wind Power Generation and Coal Mining.