stockaxis

Sattva Engineering Construction Ltd.

IPO Details
  • Issue Type Book building
  • Price range
  • Market Lot
  • Total Equity Shares 4716800
  • Face Value Rs. 10
  • Listing Date
IPO Timeline
Opening date
Closing date
Listing Date

IPO Details

Under the WSS, we design and construct large underground and overhead water tanks for storage and supply of potable/drinking water along with pump house, laying the pipeline from the water tank and achieving house service connections including electromechanical works.Under the UGSS, the sewage is drawn through the house service connection, laying the sewage pipeline connected to machine holes (pre-cast or cast-in-situ), collection wells and pump house including other civil structures, electromechanical equipments and instrumentation.Under the STP, we design, engineer, build, commission and operate sewage treatment plant of varying capacities which typically includes construction of inlet chamber, screen and grit chamber, primary clarifier, sequential batch reactor (“SBR”) basin, chlorine contact tank, sludge thickener, digestor, bio-gas tank and other civil structures, electromechanical equipments and instrumentation.Under the WTP, we design, engineer, build and commission water treatment plant of varying capacities for treatment of river or lake water which typically includes construction of raw water pumping station, inlet chamber, screen chamber, clariflocculator, filter press, rapid gravity sand filter beds, chlorinator and other civil structures, electromechanical equipment and instrumentation.We use Supervisory Control and Data Acquisition (“SCADA”) system for real-time monitoring of the key performance parameters of our projects under Water Supply Scheme, Sewage Treatment Plant and Water Treatment Plant. The system helps in real time monitoring and analysis of various key operating parameters of the plant such as discharge per minute, power consumption and chemical level in reaction process. This system is also connected to the central monitoring system of pollution control board and the customer to enable real time monitoring our various parameters and helps in a timely fault detection in the solar plant, which helps the control room at the site take corrective actions. We have also implemented SAP Business One (“SAP B1”) ERP system for better project management and internal controls.

Projects

1. Project Name: To meet long-term working capital requirements

Project Cost: 275

Promoters

Prmoters Name

1. Santhanam Seshadri

2. R Sekar

3. Jagachchandarr Sekar Uthra

Prmoters Holdings
  • Pre Share Capital: 10989000
  • Pre Promoter Holding: 86.18
  • Offer to Public: 4716800
  • Post Share Capital:
  • Post Promoter Holding:

Registrar

Registrar Name:Link Intime India Pvt Ltd.
Phone: 91-022-25946970/71/72/73/74/75/76/77/78/60320
Email: helpdesk@linkintime.co.in
Website: www.linkintime.co.in

Lead Managers

  • Vivro Financial Services Pvt Ltd

Subscription Details